Civil work, Site Preparation, Electrical Work For Chevron Sarta. Duration: 5 Months
Maintenance in KAR Refinery
Repairing Steel Tanks & Heat Exchangers, Painting Steel Tanks For KAR Group. Duration: 5 Months
Furniture Lot-1
Supply office furniture for Human Rights Building – Erbil For UNOPS. Duration 5 weeks
Renovation of Rain Water Drains in front of EIA Main Office
Building Manholes and installation of Drain Pipes For Erbil International Airport. Duration: 2 Weeks
Prefabricated Caravans
Constructing of 20 prefabricated caravans with all services (Flooring with Ceramic tiles & parquet sheets, PVC windows, Iron Main Door, Lighting, cabling and AC units) For UNOPS. Duration: 3 Months
Roads and Land Clearance at Pirmam-1
Construction of well pad, access road, pump station, supply and installation lighting pole with electrical cable with control board, supply and installation of HDPE pipe line 6km, fencing, supply equipment For ExxonMobil-EMKRIL.
Duration: 1 Year
Reclamation Pirmam-1
Removing fences, removing concrete, filling pits and cutting activities For ExxonMobil-EMKRIL.
Duration: 3 Months
Roads and Land Clearance at Alqosh-1
Construction of well pad, access road, pump station, supply and installation lighting pole with electrical cable with control board, supply and installation of HDPE pipe line 14km, fencing, supply equipment For ExxonMobil-EMKRIL.
Duration: 1 Year
Crossing River Alqosh-1
Building concrete river bridge by using concrete culverts and casting concrete then filling the area with crush stone and making the compaction For ExxonMobil-EMKRIL.
Duration: 1 Week
Generator Maintenance Alqosh-1
Making the maintenance for diesel generators For ExxonMobil-EMKRIL.
Duration: 3 Months
Reclamation Alqosh-1
Removing fences, cleaning contaminated flare pit, removing concrete, filling water pits and cutting activities For ExxonMobil-EMKRIL.
Duration: 3 Months
Renovation of Entrance Road
Casting concrete for parking area and road gutters, supply with installation Concrete tiles for road’s walkway For Nawroz Telecom.
Duration: 1 Month
Renovation of EIA Check Point
Removing the damaged area from the road and casting concrete as a pavement, constructing water ditch, supply with installation septic tanks For Erbil International Airport.
Duration: 1 Month
Renovation of EIA Tower
Supply with installation 3 AC units for EIA main tower For Erbil International Airport.
Duration: 2 Weeks
Khabat Thermal Power Station
Land Preparation and Casting Concrete for Camp’s Foundation
Duration: 1 Month
Sanjel Yard Area
Design and Construct Sanjel Yard Area 55,815 m2 which include 4 ware houses of steel structure 20*40m and 10,000 m2 concrete roads and pads with 9000m2 crushed stone and asphalt roads with the facilities of trenches, lightings, main power transformer For Sanjel.
Duration: 4 Months
Transportation
Transportation services for goods and equipments For Weatherford.