Smart Services solutions for your business

A full range of quality services

Our Projects

EPF Sarta

Civil work, Site Preparation, Electrical Work For Chevron Sarta.
Duration: 5 Months

Maintenance in KAR Refinery

Repairing Steel Tanks & Heat Exchangers, Painting Steel Tanks For KAR Group.
Duration: 5 Months

Furniture Lot-1

Supply office furniture for Human Rights Building – Erbil For UNOPS.
Duration 5 weeks

Renovation of Rain Water Drains in front of EIA Main Office

Building Manholes and installation of Drain Pipes For Erbil International Airport. Duration: 2 Weeks

Prefabricated Caravans

Constructing of 20 prefabricated caravans with all services (Flooring with Ceramic tiles & parquet sheets, PVC windows, Iron Main Door, Lighting, cabling and AC units) For UNOPS.
Duration: 3 Months

Roads and Land Clearance at Pirmam-1

Construction of well pad, access road, pump station, supply and installation lighting pole with electrical cable with control board, supply and installation of HDPE pipe line 6km, fencing, supply equipment For ExxonMobil-EMKRIL.

Duration: 1 Year​

Reclamation Pirmam-1

Removing fences, removing concrete, filling pits and cutting activities For ExxonMobil-EMKRIL.

Duration: 3 Months​

Roads and Land Clearance at Alqosh-1

Construction of well pad, access road, pump station, supply and installation lighting pole with electrical cable with control board, supply and installation of HDPE pipe line 14km, fencing, supply equipment For ExxonMobil-EMKRIL.

Duration: 1 Year​

Crossing River Alqosh-1​

Building concrete river bridge by using concrete culverts and casting concrete then filling the area with crush stone and making the compaction For ExxonMobil-EMKRIL.

Duration: 1 Week​

Generator Maintenance Alqosh-1​​

Making the maintenance for diesel generators For ExxonMobil-EMKRIL.

Duration: 3 Months​

Reclamation Alqosh-1​

Removing fences, cleaning contaminated flare pit, removing concrete, filling water pits and cutting activities For ExxonMobil-EMKRIL.

Duration: 3 Months

Renovation of Entrance Road

Casting concrete for parking area and road gutters, supply with installation Concrete tiles for road’s walkway For Nawroz Telecom.

Duration: 1 Month​

Renovation of EIA Check Point

Removing the damaged area from the road and casting concrete as a pavement, constructing water ditch, supply with installation septic tanks For Erbil International Airport.

Duration: 1 Month​

Renovation of EIA Tower

Supply with installation 3 AC units for EIA main tower For Erbil International Airport.

Duration: 2 Weeks

Khabat Thermal Power Station

Land Preparation and Casting Concrete for Camp’s Foundation

Duration: 1 Month

Sanjel Yard Area​

Design and Construct Sanjel Yard Area 55,815 m2 which include 4 ware houses of steel structure 20*40m and 10,000 m2 concrete roads and pads with 9000m2 crushed stone and asphalt roads with the facilities of trenches, lightings, main power transformer For Sanjel.

Duration: 4 Months

Transportation

Transportation services for goods and equipments For Weatherford.

Duration: 5 Years